Skip to content
  • LXRP Removal 300x300

Check out this incredible view of our works at Cheltenham and Mentone 😮

Over the past two weeks, workers have removed more than 74 Olympic-sized swimming pools of soil – about 200,000 cubic metres – for the new lowered rail line 🚜

As excavation wraps up, workers will soon begin reinforcing the walls of the trench before beginning to lay the tracks and signalling for the new Frankston line 

 

https://www.facebook.com/levelcrossings/videos/589801895305090/?t=5

Scroll To Top